Baku/05.12.22//Turan: On December 2, President of Azerbaijan Ilham Aliyev took part in the opening of a cascade of small hydroelectric power plants Oguz-1, Oguz-2 and Oguz-3 on the Dashagyl River in the Oguz region, the website of the head of state. The President was informed that the capacity of the cascade of power plants is 3.6 MW. Electricity generation at the stations is 15 million kWh per year.It was noted that the energy demand of the Oguz...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus