Baku/14.04.17/ Turan: SOCAR has started construction of a new stationary offshore platform No. 12 in the Bulla Deniz offshore gas field, SOCAR said.According to the announcement, the platform will be designed to drill five production wells.“The platform will be installed on five support blocks at a depth of 30 meters. On the base there will be residential and production blocks, the most modern drilling equipment, one helicopter, two landing and t...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus