Açiq mənbələrdən foto.
"AzerGold" CJSC revealed production plans for year
Baku/15.03.23/Turan: "AzerGold" CJSC has announced plans for the extraction of gold and silver in the current year. Also, silver production is projected to be twise as less than the last year.
According to the press service of the state gold mining company, in 2023, the production of 62.500 ounces of gold and 108.300 ounces of silver is set as the target.
Last year, as a result of "improving the efficiency of using mineral resources of deposits and optimizing production processes," production indices were brought to 62.100 ounces of gold and 223.100 ounces of silver. Gold production in 2022 rose, as compared to 2021, by 524 ounces (0.9%), and silver – by 88.600 ounces (65.9%).
In total, "AzerGold" CJSC produced 318.000 ounces of gold and 711.000 ounces of silver in 2017-2022. -08D-
Economics
-
Azerbaijan’s Cabinet of Ministers approved a detailed framework for the preparation of sector-specific strategic plans aimed at guiding the country’s economic development over the medium term.
-
Azerbaijan’s ADY Express, a subsidiary of Azerbaijan Railways CJSC, signed several strategic agreements on the sidelines of the Logitrans Türkiye 2024 exhibition in Istanbul, Turkey, reinforcing its commitment to expanding freight transport services along the Middle Corridor.
-
Azerbaijan plans to establish state-of-the-art battery storage facilities for green energy with a total capacity of 350 MW within the next 4-5 years, a well-informed source in the Ministry of Energy told Turan.
-
Shareholders of the Caspian gas condensate "Absheron" project plan to approve the Front End Engineering Design (FEED) in December, laying the groundwork for full-scale development of the field, an informed source told Turan.
Leave a review