BP names production VP in Azerbaijan
BP’s Azerbaijani Area Operations Manager (AOM) Elkhan Mammadov has been appointed BP’s Production Vice President in Azerbaijan, effective from January 1, 2016,.
Mammadov’s new appointment marks the first national vice president role with a technical portfolio of responsibilities in BP Azerbaijan.
In this role, he will be accountable for managing production performance in Azerbaijan, Georgia and Turkey.
In addition to his new role, Mammadov will also be the chairman of the Azeri-Chirag-Gunashli (ACG) Technical Subcommittee.
He will replace in this role Patrick Draughon who is moving to another assignment. With his new role, Mammadov becomes a member of BP’s Regional Leadership Team. This is in line with BP’s nationalization plan.
Elkhan Mammadov joined BP in 2001 as an instrument technician on the Chirag platform. He then held various positions on different platforms in the North Sea and Caspian Sea. Later, Mammadov was appointed as the offshore installation manager on the Chirag platform and in 2009, he moved to becoming the Area Operations Manager (AOM) for Azerbaijan Exports.
He graduated from the Operations Academy at Massachusetts Institute of Technology (MIT), Boston, USA in 2011.
Mammadov is a winner of Paul Martins Award in Operations Excellence, the chairman of Azerbaijan, Georgia, Turkey Region Operations Capability Forum and the co-chairman of the region’s Technicians Forum.
He was awarded the ‘’Progress’’ medal by the President of Azerbaijan Ilham Aliyev in 2014 for his significant contribution to the development of the oil and gas industry in Azerbaijan.-0--
Economics
-
Azerbaijan's vegetable and fruit exports dropped in the first ten months of 2024, with physical weight down 4.1% and value falling 1.7% compared to the same period last year, according to the State Statistics Committee. Key export products, including potatoes and hazelnuts, saw significant declines, while apples, persimmons, and tomatoes showed modest gains.
-
The largest scheduled maintenance ever carried out at the STAR Refinery since its launch under SOCAR's management six years ago took place from September to October 2024. This overhaul will allow the facility to increase its capacity by almost a third compared to its initial design.
-
Turkey is in talks with the United States seeking an exemption from sanctions imposed on Russia’s Gazprombank, a key financial institution for energy transactions, to maintain gas payments to Russia, Energy Minister Alparslan Bayraktar said on Tuesday.
-
Kazakhstan is charting an ambitious course to transform its oil export infrastructure, aiming to increase annual shipments via the Baku-Tbilisi-Ceyhan (BTC) pipeline by more than thirteenfold—from the current 1.5 million tons to an estimated 20 million tons. The bold strategy, presented by Energy Minister Almasadam Satkaliyev during a parliamentary session, underscores Kazakhstan’s intent to become a major player in the energy supply chain stretching from Central Asia to Europe.
Leave a review