I. Aliyev: Why didn’t the President of the European Commission come to Baku?
-
- In World
- 8 January 2025 09:26
Energy
-
"This year, we hope to receive the first gas from the ‘deep’ gas project at “Azeri-Chirag-Guneshli” (ACG),” President of Azerbaijan Ilham Aliyev said on January 7 in an interview with local TV channels. According to him, this will be a significant contribution to Azerbaijan’s overall gas production.
-
The total volume of Azerbaijani gas transported via the TANAP pipeline to and then to Europe (via the TAP pipeline) by January 1, 2025, amounted to 73.54 bcm, Elchin Ibadov, CEO of SOCAR Turkiye Enerji, reported at a press conference in Istanbul. "The total commercial gas volume delivered to Türkiye was 30.8 bcm, and to Europe – 42.74 bcm," Ibadov explained.
-
In 2024, 550 million kWh of "green energy" was produced in Karabakh and Eastern Zangezur, the Azerbaijan Energy Company (Azərenerji) reported.
-
Repair and modernization works at the STAR refinery in 2024 were successful, and as a result, the refinery’s processing capacity has been increased to 13 million tons per year, Elchin Ibadov, CEO of SOCAR Turkiye Enerji, said at a press conference in Istanbul.
Leave a review