The scheduled infrastructure work for the Trans Adriatic Pipeline (TAP) on September 19 will not lead to a reduction in gas supplies through this pipeline. According to TAP AG, the infrastructure work will take place from September 19 to September 30 at the Kipoi interconnection point (IP) on the Greece-Türkiye border, where TAP connects with the Trans Anatolian Pipeline (TANAP). TAP AG notes that these works are not expected to impact the v...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus