Yesterday, the first meeting was held in Bilasuvar to assess the actual situation with preparatory work for the construction of a 445 MW solar power plant, which will be built by the UAE company “Masdar.” The meeting was organized in the executive power of the Bilasuvar region with the participation of specialists from “Masdar”, WSP, the Asian Development Bank, the Asian Infrastructure Investment Bank, the European Bank fo...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus