The total volume of oil pumping through the Baku-Tbilisi-Ceyhan pipeline (BTC) amounted to 4.3 billion barrels, BP Regional Financial Director Colin Alan said. "4.3 billion barrels of oil have been pumped through the BTC since the beginning of its operation," Alan said in Baku at the 10th technical conference of the Society of Engineers of the Oil and Gas Industry (SPE) in the Caspian region. According to him, these volumes, in addit...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus