Açiq mənbələrdən foto.
Yerevan confirms it is starting to build a road bypassing Lachin
Baku/29.07.22/Turan: Work on the reconstruction of the M-12 Tekh-Kornidzor highway will begin in August, the Ministry of Territorial Administration of Armenia announced on Friday. No construction timeline has been announced.
The talk is about expanding the existing road, with a total length of 7-8 km. It will be connected to a new road to the south of the city of Lachin already in the territory of Azerbaijan. After that, the Armenians will not use the current Lachin corridor to travel to Karabakh, which will come under the control of Azerbaijan along with the city of Lachin. -02B-
Politics
-
The agreement reached at the COP29 climate summit has been hailed by UN Secretary-General António Guterres as a critical step in global efforts to combat climate change. Speaking after the conclusion of high-stakes negotiations, Guterres emphasized that the agreement is pivotal for maintaining the goal of limiting global warming to 1.5°C, a threshold considered crucial to preventing the worst impacts of climate change.
-
On 23 November at the COP29 climate conference in Baku, eco-activists from different countries held a protest action against the failure of countries to agree on climate finance.
-
On the eve of the closing of the COP29 climate conference in Baku, the Committee to Protect Journalists (CPJ) has drawn attention to the criminal cases of journalists detained in Azerbaijan.
-
Negotiations at the 29th session of the UN Framework Convention on Climate Change (UNFCCC) in Baku have been extended until November 24, a source in the UNFCCC Secretariat told the Turan news agency. According to the source, participants aim to finalize and sign the concluding documents by that date.
Leave a review