Açiq mənbələrdən foto.

Açiq mənbələrdən foto.

Baku/29.07.22/Turan: Work on the reconstruction of the M-12 Tekh-Kornidzor highway will begin in August, the Ministry of Territorial Administration of Armenia announced on Friday. No construction timeline has been announced. 

The talk is about expanding the existing road, with a total length of 7-8 km. It will be connected to a new road to the south of the city of Lachin already in the territory of Azerbaijan. After that, the Armenians will not use the current Lachin corridor to travel to Karabakh, which will come under the control of Azerbaijan along with the city of Lachin. -02B-

Leave a review

Politics

Follow us on social networks

News Line