“Azerenergy” OJSC replaces double-chain high-voltage overhead lines with a voltage of 110 kV in Baku, crossing roads in 5 places above the airport highway, Zykh Highway and November 8 Avenue, as well as located along the airport road, with underground cable lines. Overhead lines with a total length of 5.55 km and 44 large anchor supports are being dismantled and replaced with double-stranded underground cables with a length of 33 k...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus