Baku/08.02.19/ Turan: BP is planning to conduct three-dimensional seismic exploration at the prospective D230 block in the Azerbaijani sector of the Caspian Sea in 2019-2020."Seismic surveys will take 6 months; they are scheduled for the period 2019-2020. The goal of these works is to collect geophysical data on promising structures in the Northern Absheron basin and to detect geological structures with the presence of hydrocarbons," says BP-Azer...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus