Baku/13.12.21//Turan: The European Investment Bank (EIB) has allocated the third tranche of the loan to finance the construction of the Greece-Bulgaria interconnector (IGB).According to Natural Gas World, the bank allocated  30 million euros  of tranche after checking the progress of the project.The last tranche of 19.9 million euros is expected to be paid in the second quarter of 2022. Thus, the bank is allocating a total of 110 million euros fo...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus