Baku/11.05.18/ Turan: BP-Azerbaijan will complete drilling of two production wells within the framework of the Shah Deniz-1 project in 2018. This was announced by SOCAR President Rovnag Abdullayev in his article published in the official newspaper Azerbaijan."Currently, the production capacity of the Shah Deniz field is 30 mcm of natural gas and 7 thousand tons of condensate per day. Within the framework of Stage-1 drilling works are continuing,...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus