Baku/24.06.22//Turan: Active preparations are underway for the commercial launch of the Greece-Bulgaria interconnector (IGB). Since mid-June, tests have been carried out on the 182-kilometer pipeline route using natural gas. According to the project company ICGB AD, at present the volume of gas pumped through the IGB is 3.7 mcm."At the first stage of testing, gas is supplied in stages in the direction of Stara Zagora - Komotini. All sections are...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus