TAP ALSO PREFERS AZERBAIJANI GAS
    BAKU/16.09.10/TURAN: Caspian gas will be the main source to fill the Trans-Adriatic Pipeline (TAP) (10 billion m3). This was announced by EGL, Statoil and EON Ruhrgas (the project"s shareholders). TAP will use Shah Deniz Stage II gas, and not Iranian gas, in the `current political circumstances`.
     * TAP is to be 520 km long. It will start in Greece and go to Italy via Albania and the Adriatic Sea. --0--

Leave a review

Economics

Follow us on social networks

News Line