Baku/15.07.22/Turan: The project to increase production at the Tengiz field (operated by Tengizchevroil, TCO) has been completed by more than 90%, Prime Minister of Kazakhstan Alikhan Smailov said at an expanded government meeting with the participation of the president of the republic on Thursday.In February, it was reported that the expansion project at the Tengiz field was 89% complete, with the first oil received from the third of four meteri...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus