Baku/16.07.18/ Turan: At present, more than 1,230 km of pipes have been laid along two routes of the Turkish Stream gas pipeline, which makes up 66% of the total length of the offshore section of the gas pipeline. According to the press service of Gazprom, the head of Gazprom Alexei Miller informed the Ambassador of Serbia Slavenko Terzich on this in St. Petersburg."Also at the meeting there was a talk about the measures taken by the Serbian side...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus