Baku/29.08.18/ Turan: At the first offshore field in Kashagan, developed by the consortium North Caspian Operating Company NV in the Atyrau region, 17.5 million tons of oil was extracted, Kazinform reports."Since the resumption of oil production in the Kashagan field in 2016, the company NCOC produced 17.5 million metric tons of oil. Over this period, more than 5 bcm of gas was produced. All raw materials are delivered to the world market. During...

Please login or subscribe to read more

Leave a review

Energy

Follow us on social networks

In Focus